High-Rise Office Carpet Tile Installation

This documented carpet installation project took place in Fort Lauderdale, Florida within a two-floor high-rise office scope. Existing flooring needed removal and replacement while office tenants remained active. Livane Renovation's recorded scope included removal of existing flooring, installation of geometric charcoal carpet tile, work sequencing across two office floors. The project record describes completed carpet tile installation across both office floors while coordinating around active tenants. Where the source material does not identify products, dates or technical settings, those details are deliberately left unspecified rather than inferred.

Fort Lauderdale, FloridaTwo-floor high-rise office scope8,200 square feet (existing site claim; business verification recommended)
Completed charcoal carpet tile installation in a Fort Lauderdale high-rise office

Existing condition

What the record shows before work

The source confirms existing flooring removal but does not identify the old material, adhesive condition or substrate repairs.

Scope

Documented work

  • Removal of existing flooring
  • Installation of geometric charcoal carpet tile
  • Work sequencing across two office floors

Method

How the scope was approached

The record supports phased removal and carpet-tile installation. Adhesive manufacturer, subfloor treatment and exact phasing dates are not documented.

  1. 1Plan phases around tenant access
  2. 2Protect travel routes and isolate the active work area
  3. 3Remove the existing flooring included in each phase
  4. 4Prepare approved areas for carpet tile
  5. 5Install the documented carpet tile pattern
  6. 6Reopen completed areas after punch review

Materials and surfaces

Recorded finish context

  • Geometric charcoal carpet tile

Constraints

Conditions that shaped the work

  • Active tenant schedules
  • Two-floor work area
  • High-rise access and material movement

Result

Documented outcome

The project record describes completed carpet tile installation across both office floors while coordinating around active tenants.

Completed charcoal carpet tile installation in a Fort Lauderdale high-rise office
Documented completion image

No verified before image is published for this project, so this page does not present an inferred before-and-after comparison.

Evidence basis: Existing renovation project gallery. Unrecorded project details are not inferred.